Assembly and logistics
Panels delivered flat on a pallet: door, ceiling, floor (optional), side walls and back. Joined by cam-lock profiles (an eccentric system built into the panels) tightened with an Allen key — no visible fixings, no thermal bridge. Sealed by a double EPDM compression gasket. With two trained people, a 10 m³ kit goes up in half a day; a 20 m³ in a full day. Our assembly manual is step-by-step and illustrated.

